Automatic Schedule Narrative

Upload successive Primavera P6 XER updates and receive a structured, consultancy-grade narrative report — milestone movement, delay driver attribution, float position and recommended actions — generated automatically from your schedule data. Where the file data can't explain the "why", add a short reason against the driver and it will be woven into the narrative. Runs entirely in your browser; nothing is uploaded to a server.

Automated Output: This narrative is generated automatically from the schedules you upload using rule-based analysis, not a live review. It is a first draft intended to save drafting time on your period report and should be reviewed before issue. Independent expert review available on request.
↑
Upload P6 Schedule Updates
Drop two or more .XER files here, or select them below. The earliest file is set as your baseline automatically — change this in the strip below if needed. At least two periods are required to generate movement narrative.
Period Narrative
Auto-generated from the uploaded schedule data and any reason context provided above.
Float Erosion Trend
Average total float movement across active, non-LOE activities between each successive update.
Milestone Movement
Contractual milestones tracked from baseline to the latest update.
StatusIDMilestoneBaselineCurrentSlipFloat
Delay Drivers
Largest contributors to programme movement, ranked by delay beyond available float at the start of each window. Includes activities that completed during a window even where P6 has since dropped them from the live critical path.
WindowIDActivityBeyond FloatCause (from file)Reason (recorded)
Want Expert Review?
Have your analysis reviewed by an expert, add professional narrative and sign off the report. Direct senior expertise — no account managers, no junior staff.
Request Expert Review →